Question:
Can I schedule workflows to run only on a specified schedule?
Solution:
As of version 6.11, it is possible to set workflows to run on a schedule from Workflow Manager.
- Open Workflow Manager.
- Edit an existing workflow or create a new one.
- Open the "Start" task and click the "Trigger" tab at the top.
- From the trigger window, you will find a tab in the middle called "Schedule". From here, you will be able to set the desired scheduling accordingly.