-
Hi-
Is there a way to trigger the time out (bypassing the time out period) for demonstration purposes? I know how to use the "Waiting Instances" tab in the workflow designer and tell it to continue, but that just continues the "OK" path.
Thanks, Mike
-
I have a customer that would like to have engineering drawings OCR'ed. While most of the text to be indexed will be set along one side of the drawing, there might be text on the main drawing area at various angles. Will that be able to be read automatically?
Thanks, Mike
-
I was disappointed that I couldn't import a file cabinet from a 7.4 site to a 7.5 site, but now I found out that I had to upgrade my Desktop Apps to use them on the 7.5 site. Now I can't use the Desktop Apps on my 7.4 sites. Is this going to happen after each upgrade? Is there a way around this?
Thanks
-
Hi-
I would like to start a workflow with the submission of one form, then at a certain point continue with the submission of a second form. I am trying to use the "Wait for event" activity, but I am not sure how to configure it. Is this the proper activity to use?
Thanks,
Mike